Are you a roofing company?
No, and it matters that we say so. We are a referral service, not a contractor. The roofing work, the licence, the insurance and the warranty all sit with the independent company you choose.
What people want to know before they hand over a phone number, and what they ask once the calls start.
No cost to you. Contractors pay us, you do not.
We are matching it now against roofing contractors working in Rancho Santa Margarita and the surrounding area.
If you do not hear anything today, check your voicemail and spam folder — contractors often call from a mobile number.
No, and it matters that we say so. We are a referral service, not a contractor. The roofing work, the licence, the insurance and the warranty all sit with the independent company you choose.
Codes in most places allow two layers. That does not make it wise. You lose the chance to see the deck, and the next roofer has twice as much to remove.
It depends almost entirely on how much life is left in the material. Ask any contractor who inspects it to give you a number of years and a reason. If two of them independently say the same thing, believe it.
They come off and go back on, and that is a separate cost, often handled by the solar installer rather than the roofer. If the roof is near the end of its life, do the roof first — removing and refitting panels twice is money wasted.
No more than three. We picked that number because two quotes is not enough to spot an outlier and five is an ordeal.
It is the most under-sold part of a roof. Trapped heat and moisture shorten shingle life, warp decking, and in cold weather it is what turns snow into an ice dam.
Here, the long dry run from May to October is the easy window. November through March is when the phone rings hardest, which means less flexibility on dates and less room on price.
Two days is typical for asphalt. Add days for steep pitch, multiple layers to strip, tile work, or a roof with a lot of valleys and penetrations.
Most quotes here for a standard asphalt replacement come in around $12,000 to $25,500. That assumes one layer to remove and sound decking. Every quote you get should say in writing what happens if the decking is not sound.
Rated life and real life are different numbers. Here, ordinary rated life is a fair guide, provided the attic breathes. Ventilation and the quality of the installation move that more than the brand does.
Contractors have to give us their state licence number and proof of liability and workers compensation cover before they can receive requests. You should still ask to see current certificates yourself before work starts — a licence can lapse between checks.
Almost certainly, for a full replacement. The contractor should pull it, and the fee should be a visible line on the quote rather than a surprise.
Only if it is the same roof. Most large gaps between quotes are scope gaps. Ask the cheapest contractor which of the other quotes items they have left out, and why.
Move what you can out of the way, put a bucket under it, and if there is a bulge in the ceiling put a small hole at its lowest point to let the water out in one place rather than bringing the whole panel down. Then mark your request as an emergency — those go out first.
No cost, no obligation, and never more than three contractors.